Background
Towers were locked out and cleaned one at a time, in coordination with the plant operators: descaling, high-pressure washing and debris vacuuming. High-pressure extension wands made it possible to clean the upper sections without scaffolding. Sealing gaskets on the upper basins were redone, followed by a photo report.
Result: no production downtime and no scaffolding to install.